www.killerjeanne.com
home
Current water level
September 10, 2005
September 15, 2005
September 28, 2005
October 15, 2005 & June 18,2006
Water pump is operational. Top floor & lower level of LCC are clear. The missile acess tunnel is clear & silo drained to level 5.
January 03, 2007
From information gathered from the sellers the silo & control center has been filled with water for the last 17 years. Silo was drained halfway 2 years ago and the pump broke. For the ebay sale pumping began again and water level was drained to level 3. New pump was placed in August 2006. Level was decreasing about a 1 foot per day. Water level has stabilized to around level 5.
new
January 03,2007